Bookings & Applications

 

FAQ


Moving & Deliveries

When is moving permitted in the building?
Moving is allowed 7 days a week between 8:00 AM – 5:00 PM, excluding public holidays.

What are the moving procedures and booking process?
Residents must book their move at least 48 hours in advance with concierge or building management. Bookings can be made via email, phone, or the BuildingLink portal. Only one move per building is allowed at a time, and lift protection will be installed before the move.

Where can I park my moving / delivery vehicle?
Vehicles should be parked in the loading dock, accessible via the B2/B3 car park entrance. Visitor parking bays may also be used during the move if pre-approved by concierge. Moving items through the main entrance foyer is not permitted – all moves must go through the basement car park.

What size vehicle can fit into the loading dock?
Loading dock maximum height: 4.2m
Car park maximum height: 2.2m
Large trucks cannot enter the residential car park levels. Residents may need a smaller vehicle (e.g., a ute) to transport items from the loading dock to the B2 lift foyers depending on .

What are the lift sizes?
Buildings A & B:
Lift Door Opening: 1000mm (W) x 2100mm (H)
Inside Car Dimensions: 1600mm (W) x 2100mm (L) x 2400mm (H)

Building C:
Lift Door Opening: 1000mm (W) x 2100mm (H)
Inside Car Dimensions: 1400mm (W) x 1970mm (L) x 2400mm (H)

How do I pay the required security deposit prior to moving in or out?
A $200 refundable moving bond must be paid via EFT (Electronic Funds Transfer) before the move. Payment proof must be emailed to concierge@rydegarden.au. The bond will be refunded within 2-10 days after the move, provided no damage or violations occur.

 

Renovations

Can I undertake renovations to my property?
Yes, lot owners can renovate their apartments, but all works must comply with NSW Strata Regulations and the building’s by-laws. Some renovations require formal approval from the Owners Corporation, while minor cosmetic changes may not.

What type of renovations require approval before proceeding?
Renovations are categorised into three types:
– Cosmetic Works (No Approval Needed):
– Painting, installing curtains or blinds, replacing carpets, or minor fixture changes.
These do not affect common property and can be done without approval; however, occupants should be mindful of noise impact on neighbours and notify Building Management ahead of any noisy works so that adequate notice can be provided to other residents.
Minor Renovations (Approval Required from the Owners Corporation):
– Installing hard flooring (e.g., timber or tiles), kitchen and bathroom upgrades, or changing internal walls (non-structural).
– These works require written approval from the Strata Committee before starting.
Major Renovations (Approval & Special Resolution Required):
Structural changes, altering plumbing or electrical systems, waterproofing, or major alterations that impact common property.
These require a General Meeting resolution and 75% approval from the Owners Corporation.

What is the renovation application process?
1. Contact Building Management via email to obtain the renovation application form and the relevant by-laws.
2. Submit a detailed renovation application, including plans, scope of work, contractor details including licences and insurances, and impact assessments (e.g., noise, waste disposal).
3. Wait for approval – minor renovations are reviewed by the Strata Committee, while major works must go through an Owners Corporation meeting.
4. Once approved, you must follow all conditions set by the Owners Corporation, including the use of specified materials, adherence to approved work scopes for common property modifications, designated work hours, and contractor insurance requirements.

 

Pets

Can I keep a pet in my property?
Yes, but pet ownership must comply with the building’s by-laws and NSW strata laws. Residents must submit a formal request to Building Management, who will provide the pet application form specific to your building. Approval is required before bringing a pet into the property.

What are the conditions regarding keeping a pet?
– Pet owners must ensure their pets do not cause a nuisance to other residents and comply with any restrictions set by the Owners Corporation. Conditions may include size or breed limitations, noise control, and responsible management in common areas. Under NSW Strata Schemes Management Act 2015, strata schemes cannot unreasonably refuse a pet request unless it poses a risk to residents or common property.
– For more details or to apply, email Building Management to obtain the relevant application form.

 

Amenities Bookings

Can I book the buildings amenities and what is the process?
Yes, amenities do require a booking. Residents can refer to the Forms & Procedures section of the building’s website for detailed booking instructions for each amenity. If further assistance is needed, please contact the concierge team.

 

Keys & Access Devices (Fobs / Remote Controls)

How does my intercom handset work?
Please download a copy of the intercom system instructions from the Buildinglink resident library which will assist you with how to use the intercom.

How do I apply for an additional key or access device?
To obtain an additional key or access device please complete the application form available via the Ryde Garden website under Forms & Procedures. Everything you need to know about obtaining an additional key / access device is available in this form.